The process is slow, but it gives much better results. A straight edge is placed from bulkheads "C" and "E" and the intersection with the posterboard strip is marked. The frame is canted aft 20 degrees, parallel to the "C" bulkhead, and "E" as well.
Labels: Bulkheads, Fuselage
0 Comments:
Post a Comment
<< Home